Air Carrier Compliance Group

Part 91 LOAs & Manuals

Corporate and private operators rely on ACCG for Flight Operations Manuals (FOM), International Operations Manuals (IOM), and Minimum Equipment Lists (MEL / e-MEL) — plus RVSM, EFB, and HazMat support. We draft, submit, coordinate with your FSDO, and deliver taylor-made documents ready for your EFB.

Packages include tailored checklists, submittal forms, and version control. We maintain inspector-ready documentation and can host secured online copies for your EFB.

  • PDF / Secure Cloud EFB Storage
  • Submission & FAA coordination
  • Comment resolution to acceptance
  • Optional e-records & alerts

Primary Manuals & LOAs

Flight Operations Manual (FOM)

Combines manufacturer guidance with FAA/ICAO standards to establish SOPs, safety programs, and ERP. Ideal for jets and international ops.

  • Standard operating procedures
  • Safety & training integration
  • Emergency response policies

International Operations Manual (IOM)

Covers RVSM, NAT/HLA, ICAO Annex 6, contingency procedures, and destination-specific requirements for cross-border flights.

  • NAT/HLA & ICAO alignment
  • Flight planning & communications
  • Enroute contingencies

Minimum Equipment List (MEL / e-MEL)

Operator-specific MEL aligned to the MMEL and your aircraft configuration, with M/O procedures and deferral guidance.

  • Number Installed / Required
  • (M)aintenance / (O)perations steps
  • Deferral categories & tracking

RVSM LOA (B046)

Documentation of equipment, maintenance, monitoring, and crew procedures for Reduced Vertical Separation Minimums.

EFB Program

Portable EFB program covering device management, data updates, backup power, and operational policy.

Hazardous Materials (HazMat)

Training and acceptance procedures for 91 operators who carry, ship, or interface with DG/HM.

Our Process

  1. Intake: Aircraft, bases, and intended areas of operation.
  2. Drafting: FOM, IOM, MEL, and LOAs tailored to your operation.
  3. Submission: Prepare FAA package and coordinate with FSDO.
  4. Comments: Resolve findings; update documents; finalize acceptance.
  5. Delivery: PDF and optional secure cloud EFB storage.

Timeline

Most manuals complete in 2–4 weeks; multi-manual or multi-aircraft packages typically 30–60 days, subject to FSDO workload and readiness.

  • Fast-start intake within 2–5 business days
  • Drafts delivered in phases
  • Comment resolution tracked to closure

Need FOM, IOM, or MEL?

We’ll map your path, draft the documents, and coordinate with your FSDO.

Request a Consultation