Air Carrier Compliance Group
Bundle · Part 91

International Operations Package

Everything you need for your first oceanic or international trip, prepared together: RVSM, NAT HLA, oceanic RNP, data link, MEL, and your International Operations Manual.

Why bundle it

A first North Atlantic crossing usually needs four or five approvals at once. Applied for separately, they mean separate intakes, separate reviews, and separate chances for a delay.

Prepared together, they share one intake, one manual, and one FSDO conversation. The procedures line up with each other, and nothing falls through the gap a week before departure.

What is included

Each approval has its own page with details. The package covers whichever ones your trip needs.

MANUALS

Your international manual

  • International Operations Manual covering every approval above
  • Oceanic checklist and Master Document procedures
  • Regional appendices for where you fly
  • PDF and secure online copies for your EFB

How it works

1. One intake

Aircraft, crew, base, equipment, and where you plan to fly.

2. One manual

Your International Operations Manual and every LOA application, built to match.

3. One submission

We assemble the package and coordinate with your FSDO.

4. Through to issuance

We answer inspector questions and fix findings until every letter is issued.

What we need from you

  • Aircraft make, model, serial number, and registration
  • AFM and supplements for navigation, data link, and RVSM
  • Equipment list, including STCs
  • Pilot names and training records
  • Your first international trip: route and dates

What we deliver

  • Every LOA application your trip needs
  • International Operations Manual and MEL
  • Flight plan code review for international filing
  • Streamlined-ready: when your aircraft manufacturer and training provider take part in the FAA's Streamlined Part 91 Operational Approval program, we prepare your package for streamlined review
  • FSDO coordination and comment resolution until issuance
  • One flat-rate quote for the whole package

Mistakes the package prevents

These are the problems we see when approvals are handled one at a time.

One approval missing

An RVSM LOA without data link still keeps you off the best North Atlantic altitudes.

Procedures that disagree

Separate manuals written at different times often contradict each other.

Last-minute surprises

Finding a missing LOA the week of the trip usually means a delay or a reroute.

ADS-B Out assumptions

ADS-B Out authority for RVSM ends at the U.S. border. Foreign airspace needs LOA B046.

Package questions

How early should I start?

As early as you can. FSDO review times vary, so start well before your first international trip.

What if I already hold some of these LOAs?

We review what you have and only prepare what is missing or out of date.

I just bought an aircraft. Does the package cover a new owner?

Yes. LOAs belong to the operator, so a new owner needs new letters. The package is the fastest way to get all of them at once.

Source

Tell us about your first international trip.

Send your aircraft and route. We will reply with a plan, next steps, and one flat-rate quote.